STEJASA S.A (Spain), main supplier of the above system to J&P AVAX S.A (EPC Contractor), Subcontracted to ERGOTEM S.A the following:
Supply, fabrication, pre-assembly, testing and delivery of two (2) diverters for flue gas from Gas Turbines either to Heat Recovery Boilers (full cycle) or to Stacks (open cycle)
Supply, fabrication, testing and delivery of two (2) Stacks for open cycle operation of system