CATEGORY: Industrial
CUSTOMER: ELVAL SA Greece
BUDGET: 2.000.000 €
LOCATION: Greece
ELVAL S.A, the bigger Greek Aluminum producer executed a big investment program of 150 million Euro of installation a New Tandem hot mill production of 1,8mm till 12,70mm thickness, in maximum 2,6m width.
ERGOTEM undertook the supply, fabrication, testing, delivery and erection of part the project, as follows:
The main Stainless Steel Storage Tanks made by material AISI316L and fabricated in six (6) segments for transportation and erection purposes
Full air ducting system, including the erection of air fans, expansion joints and other equipment
Other pressurized vessels and auxiliary equipment