Mining
Lignite Breaker System in SES Ptolemais-Unit V
CATEGORY: Mining
CUSTOMER: PUBLIC POWER CORPORATION SA Greece
BUDGET: 1.600.000 €
LOCATION: Ptolemais, Greece
ERGOTEM S.A undertook the Lignite Breaker System erection in PPC’s Ptolemais V site.
The project comprised of:
- The design, and construction of reinforced concrete bases with a total volume of ~ 250 m3
- The design, construction, painting, and erection of metal structures for the anchoring of the Lignite Breaker with a total weight of ~ 92 tn
- The supply, erection and commissioning of a complete Breaker system with a capacity of 3,500 tn/h that will receive lignite with a grain size of ~ 700 mm
- The supply of all auxiliary mechanical and electrical installations
- Tests and Adjustments of all the E/M equipment of the lignite breaker installation